|
This is going to be
real simple. I will just put these in a time line order and update as I go
along.
Enjoy!!
|
|
|

|
| |
|
Now we got to this point and
thought that the room would need pillars, but how to attach? We got them sized and made and worry
about that later. This is looking towards the screen
area.

|
| |
|

|
| |
|
Painting the ceiling tiles was
not fun. I did not think it would
need this many dang. Two coats, it
sucked that first one right up.

|
| |
|
Once the rack/stage was
starting to take shape, I realized that I would not be able to get to the
back. We added a pair of drawer
slides to the center section to make it removable by sliding forward. Works slick.

|
| |
|

|
| |
|

|
| |
|

|
| |
|

|
|
 |
|

|
| |
|
At this point the power boxes,
speaker boxes and conduit was run.
Mistake one was thinking ½ inch was ok. Large is good, super size is
better.

|
| |
|

|
| |
|

|
| |
|

|
| |
|

|
| |
|

|
| |
|

|
| |
|

|
|